Close

Hudson Creek Power Station 2

Aerial view of power station site

In March 2020, Rimfire Group successfully achieved financial close of the 12MW capacity Hudson Creek Power Station 1 project (HCPS1), now constructed and exporting electricity onto the Darwin-Katherine electricity grid.

Rimfire Group is now at an advanced stage of developing Hudson Creek Power Station 2 (HCPS2) with a view to extending the benefits of reliable baseload power generation technologies that support the Northern Territory’s Darwin-Katherine electricity grid.

HCPS2 is a greenfield 12-25MW gas-fired power generation facility located adjacent to HCPS1 in Wishart, Northern Territory.

The HCPS2 design utilises high efficiency gas-fired reciprocating engine technology to efficiently and reliably export electricity onto the Darwin-Katherine electricity network operated by Power and Water Corporation, with 100% of the generation output sold through Rimfire Group’s retail operations.

The site is located on an industrial parcel of land in the industrial precinct of Wishart with excellent proximity to existing gas supply infrastructure and adjacent to the Hudson Creek Zone Substation owned and operated Power Water Corporation.

The size of the facility has been modelled to suit capacity at the local substation and to provide suitable volume of incremental utility-scale power generation output to the Darwin-Katherine electricity grid.

HCP2 will generate approximately 108-216 GWh of reliable and fully dispatchable power to the Northern Territory.

HCPS2 represents a capital investment in the order of $55-80M that will require a construction workforce for the 12-18 months construction phase and an operations workforce throughout the 15-year operational phase.

Direct economic benefits from HCPS2 will flow from the capital construction activity, operations and maintenance activities, and the competitive retail electricity provided to Northern Territory consumers through Rimfire Group’s retail electricity business.

machinery on truck

Company Profile

Rimfire Group is a privately owned multi-disciplined group of companies with a strong market presence in the Northern Territory, and with capabilities in project development, electricity generation, and energy retailing.

Rimfire Group’s objectives are to commercialise power project that reduce electricity costs for their customers, accelerate the uptake of diversified energy, and develop power project solutions in response to market challenges.

As an incumbent market participant with a proven track record in power project development in the Northern Territory Electricity Market, Rimfire Group is ideally positioned to develop and operate utility-scale power generation facilities in the Northern Territory.

  • Investment type: Greenfield
  • Status: Offtake in Place, Target Financial Close December 2025
  • Project value: A$55 to $80 million
  • Region: Wishart, Northern Territory

Download the Hudson Creek Power Station 2 investment opportunity flyer PDF (258.3 KB).

Disclaimer

This investment opportunity is brought to market by an external proponent. The Northern Territory of Australia exercised due care and skill to ensure that at the time of publication the information contained in this publication is true and correct. However, it is not intended to be relied on as professional advice or used for commercial purposes. Australia's Northern Territory gives no warranty or assurances as to the accuracy of the information contained in the publication and to the maximum extent permitted by law accepts no direct or indirect liability for reliance on its content.